Bropack Carton box making machine carton case erector carton erecting machine Automatic Carton Sealing Machine
1. Definition of the opening box machine
Carton forming machine is also called out of the machine and its automatic carton forming principle is to point to perform unpacking, forming, under the bottom of the cover, and completed the part of the tape paste, open the folded cardboard box board, according to certain procedures or at the bottom of the box, then tape sealing after delivery to special equipment for packing machine.Automatic carton forming machine, automatic box machine is large quantities of automatic carton box, automatic folding under cover, back cover assembly line equipment, automatic tape machine adopts PLC + touch screen control, easy to use, is the automation production indispensable equipment.
manufactory machine packing box carton packer
2. The structure and characteristics of the opening machine
1. Main components:
Carton storage mechanism, main frame, vacuum box, main drive, box board lifting mechanism, rocker arm lose box, out of the organization, higher institution, cartons short edge folding mechanism, carton long side closed and integer, fork pushed box, carton guide rail, compaction impact bars and hot melt adhesive system, pneumatic control system, control system, etc.
carton sealing packing machine box folding machine
Model: |
4035N/A |
Carton Size: |
L220~500mm/W150~400mm/H100~350mm |
Table height: |
H=650mm |
Speed: |
≤10 box/min |
Dimension: |
L2050×W1900×H1400mm |
Power supply: |
220V/380V 50/60HZ |
Air source: |
>500L/min,0.4~0.8 Mp |
Tape: |
W48mm-W60-75mm×L1000 |
Machine weight: |
NW-280kg GW-310kg |
FAQ:
1)Q:Are you a factory or a trade company?
A:We are the factory.
2)Q:Where are your products distributed?
A:Our products are distributed all over the world,main markets are Europe,North America, the united Arab emirates, Africa and so on.
3)Q:Can I have a sample?
A:No.
4)Q:Which port is the nearest ?
A:Shanghai port or Ningbo Port.
5)Q:What's your lead time ?
A:Normally 20-30days after we receive your deposit.
6)Q:Logistics?
A:1.Sea Shipment;
2.Air Shipment;
3.Transport by car or train;
4.Express:DHL,UPS,TNT.